Skip to content

One agent across your analog flow

From a written spec to a clean layout.

Ask Cascode…

Virtuoso, Spectre, Calibre

It does the work in your tools.

  1. 01You askGive it a spec, a cell or a question in plain words.
  2. 02It worksIt runs your tools, reads the results and tries again where a target is missed.
  3. 03You decideIt asks before it saves anything to your library.
Design and size

Sizes a circuit against your spec.

  • Changes the topology when sizing is not enough.
Layout

Draws the layout and clears DRC and LVS.

  • Starts from your schematic or from your own placement.
Port

Moves a block to a new process.

  • Meets the nominal corner before all the others.
Verify after layout

Finds what moved after extraction.

  • Tests a cause before it fixes anything.

In the Virtuoso session you have open.

  • Reads devices, sizes and nets from the live database.
  • Runs on your host, next to Virtuoso.
How your data is handled
Editing: 5_transistor_OTA schematicIllustration
R0ressegments=6vdd!vss!M12pmos4w=8ul=1um=4M13pmos4w=8ul=1um=4M7nmos4w=4ul=0.5um=4M6nmos4w=4ul=0.5um=4M10nmos4w=4ul=1um=2M11nmos4w=4ul=1um=1inpinmoutnet3net5net8
M6, nmos, w=4u l=0.5u m=4, D out G inm S net8
why is the gain this tight?

It drives the tools you already license.

Cadence
  • Virtuoso®
  • Virtuoso ADE XL, Virtuoso ADE Assembler, Maestro
  • Spectre®
  • OCEAN
Siemens
  • Calibre® nmDRC, Calibre nmLVS
  • Calibre xRC
MathWorks
  • MATLAB

Large blocks are split across a team of agents.

  1. 1An orchestrator splits the design into blocks and starts an agent for each.
  2. 2Each agent works only on its own block.
  3. 3An auditor re-computes the numbers they report.
›↵
Orchestratorwaits for a request
Auditorreports coming intx_driver.mdserializer.mdpll.mdphase_interp.mdldo.mdbandgap_ref.mdctle.mdsampler.md

How long each run took.

By hand, estimated engineer hours*With Cascode, agent time
  1. Bandgap

    Layout from the schematic, DRC and LVS clean
    8+ h
    under 15 min
  2. 1 GHz LNA

    Spec to a DRC-clean layout, nine corners, every one met, nobody stepped in
    35+ h
    under 2 h
  3. Two-stage opamp

    Spec to a DRC-clean layout, nine corners
    25+ h
    under 1 h
  4. Ring VCO

    Spec to a DRC-clean layout, nine corners, every one met, nobody stepped in
    20+ h
    under 90 min
  5. Bandgap, ported

    65 nm to 180 nm, schematic, every spec in 20 corner configurations
    16+ h
    under 3 h
  6. Wideband 60 GHz LNA

    Spec to sizing, nominal corner, ideal passives, before layout
    24+ h
    under 1 h
  7. Regulators, after extraction

    Two regulators on an already-extracted layout, every PVT corner, a 100-sample Monte Carlo
    16+ h
    under 2 h
010203040 h

Layout beside a designer's own: 13–15 % smaller on a bias block.**

Let's work together

Or write to contact@cascodeworks.com.

* required

Sent to our inbox through a form service, and used only to answer your request. Privacy, KVKK

* By-hand hours are estimates of an experienced designer’s time for the same scope as each run. Only the regulators include post-layout and Monte Carlo; none includes EM simulation. Agent time does not include your designers’ review.

** A working designer's own cells. Runs of 13–15 Oct 2026: one model, a 90-minute limit, full Calibre DRC and LVS.